this post was submitted on 05 Mar 2025
680 points (93.5% liked)

Programmer Humor

21000 readers
2031 users here now

Welcome to Programmer Humor!

This is a place where you can post jokes, memes, humor, etc. related to programming!

For sharing awful code theres also Programming Horror.

Rules

founded 2 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] tyler 13 points 16 hours ago (1 children)

pretty sure they're saying waterfall for building a rocket because that's literally how NASA builds a rocket, including the software. It's terrible for building anything other than a rocket though, because the stakes aren't high for most other projects, at least not in the way that a critical mistake will be incredibly bad.

[–] [email protected] 1 points 3 hours ago (1 children)

i take you have never heard of the V-model. basically you climb the waterfall back up to verify everything. most things that fly within the atmosphere are done that way. pretty sure NASA would do the same.

[–] [email protected] 3 points 3 hours ago* (last edited 3 hours ago) (1 children)

You can assume people here know what waterfall and the V model are.

[–] [email protected] 2 points 3 hours ago

Depends. I've heard management talk about agile and waterfall, but I've not heard even one manager say V model.