this post was submitted on 16 Sep 2024
34 points (100.0% liked)
FreeAssembly
75 readers
9 users here now
this is FreeAssembly, a non-toxic design, programming, and art collective. post your share-alike (CC SA, GPL, BSD, or similar) projects here! collaboration is welcome, and mutual education is too.
in brief, this community is the awful.systems answer to Hacker News. read this article for a solid summary of why having a less toxic collaborative community is important from a technical standpoint in addition to a social one.
some posting guidelines apply in addition to the typical awful.systems stuff:
- all types of passion projects and contributions are welcome, including and especially those that aren't programming or engineering in nature
- this is an explicitly noncommercial, share-alike space
- don't force yourself to do work you don't enjoy, or demand it of others
(logo credit, with modifications by @[email protected])
founded 7 months ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
I have ~~two~~ three stories.
Company X: Our testbed server room was supported by redundant rooftop AC units, many yards apart. During a storm, a lightning bolt forked (split) One tip.of the bolt hit AC unit one and the other hit AC unit two, killing both cooling units. To make things worse, the server manufacturer did not add a temperature safety shutdown to the units and instead configured them to fan faster the hotter they got. By the time I got there the cable management was warping and melting due to heat.
Company Y: The main datacenter was on tower 2 and the backup datacenter was on tower 1. Most IT staff was present when the planes hit.
EDIT:
Company Z: I started work at a company where they gave me access to a "test" BigIP (unit 3) to use as my own little playground. Prior to my joining the company was run by devs doubling as IT. I deleted the old spaghetti code rules so that I could start from scratch. So, after verifying that no automation was running on my unit (unit 3), I deleted the old rules. Unfortunately the devs/admins forgot to disengage replication on "unit 2" when they gave me "unit 3". So production "unit 2" deleted its rules and told production "unit 1" to do the same. Poof...production down and units offline. I had to drive four hours to the datacenter and code the entire BigIP from scratch and under duress. I quit that job months after starting. Some shops are run so poorly that they end up fostering a toxic environment.
Well, that one dark "redundancy" story...
I don't understand why they had redundancy so physically close.
Whatever affects one has a high risk of affecting the other.
Different regions is a thing for a reason.
I think the OP was talking about the other "redundancy", as in "your whole team has been made redundant". In this context your story is very dark indeed :D
My old company has both data centers in the same metro area. A lot of handwaving is involved when you ask about events that can take out a metro area (natural or man made).
"~~perverse incentives~~ budgets rule everything around me"
It's probably good to situate in time when thinking about these things. The twin towers were how a lot of companies became examples of what location redundancy really means. These days people are keeping that lesson well in mind, but back then, not so much.
There are tradeoffs to higher and higher grades of redundancy and the appropriate level depends on the situation. Across VMs you just need to know how to set up HA for the system. Across physical hosts requires procuring a second server and more precious Us on a rack. Across racks/aisles might sometimes require renting a whole second rack. Across fire door separated rooms requires a DC with such a feature. Across DCs might require more advanced networking, SDN fabrics, VPNs, BGP and the like. Across sites in different regions you might have latency issues, you might have to hire people in multiple locations or deal with multiple colo providers or ISPs, maybe even set up entire fiber lines. Across states or countries you might have to deal with regulatory compliance in multiple jurisdictions. Especially in 2001 none of this was as easy as selecting a different Availability Zone from a dropdown.
Running a business always involves accepting some level of risk. It seem reasonable for some companies to decide that if someone does a 9/11 to them, they have bigger problems than IT redundancy.
company X sounds like the sort of bad shit I remember from a DC my side of the world, which was so frequently broken in various states that occasionally you couldn't even touch the outside doorknobs (the heat would translate from the inside)
Y: oof.
Z: lol, wow. good on ya for leaving. no point sticking around in that kind of disasterzone. it ain't ever gonna get fixed by your efforts.
Company Z:
Oh God. I worked as an NSE with F5 for seven years and had the opportunity to join dozens of "oh God everything's fucked" calls, and autosync was a factor in the majority of them. I'm not sure why you would want half-finished virtual servers pushed onto your active production devices, but damn if people weren't doing that all the blasted time.