this post was submitted on 28 Dec 2023
946 points (97.8% liked)

Technology

58303 readers
14 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 1 points 10 months ago (1 children)

Yes, running them at a lower level, and yes, that would be my point. You can run them down when renewable sources pick up, but that's inefficient. Solar/wind don't mix well with nuclear; you're leaving something on the table if you try.

[โ€“] [email protected] 1 points 10 months ago

That's not a particularly complex way of looking at it. the nuclear plant is a base load plant, meaning you can pretty much just subtract its output from the predicted consumption, and then you can simply have less renewable energy, load peaking is midday anyway, which is when solar is productive. (or have less energy storage, since the nuclear plant will combat that), you would have a more consistent and regular power production at that point, and waste less money. (since you aren't burning money on running a nuclear plant at a reduced/no output, you would technically be burning solar energy (you cant burn wind energy, you just stop the turbine, and it wont produce power) but that's cheaper anyway, and besides beyond install costs, very low continual maintenance)

Though if you were going to shutdown the nuclear plant at its EOL then you would need to increase production of renewables, which is easy enough. Saying that "nuclear and solar/wind don't mix" is just kind of weird. Realistically the only better mix would be solar/wind and gas since gas can manage peak loads super trivially, which is of course not very green. So arguably nuclear would be your ideal match unless you went explicitly solar/wind.