this post was submitted on 08 Sep 2023
237 points (94.4% liked)

Asklemmy

43395 readers
1232 users here now

A loosely moderated place to ask open-ended questions

Search asklemmy ๐Ÿ”

If your post meets the following criteria, it's welcome here!

  1. Open-ended question
  2. Not offensive: at this point, we do not have the bandwidth to moderate overtly political discussions. Assume best intent and be excellent to each other.
  3. Not regarding using or support for Lemmy: context, see the list of support communities and tools for finding communities below
  4. Not ad nauseam inducing: please make sure it is a question that would be new to most members
  5. An actual topic of discussion

Looking for support?

Looking for a community?

~Icon~ ~by~ ~@Double_[email protected]~

founded 5 years ago
MODERATORS
 

They were invented decades ago.

They have fewer moving parts than wheelbois.

They require less maintenance.

There's obviously some bottleneck in expanding maglev technology, but what is it?

you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 9 points 1 year ago (1 children)

It's more than that - doubling air resistance only doubles the energy use if it's the only inefficiency on the train (e.g., no losses in the magnets, HVAC, lighting, etc.). Add onto that the fact that you're basically eliminating rolling resistance from traditional trains when switching to maglev, and the expected outcome should be much less than double.

Finally, the most important part, each high speed rail route of any meaningful distance has the opportunity to displace a certain amount of air travel, so big picture, HSR results in a significant decrease in overall energy consumption.

[โ€“] [email protected] 2 points 1 year ago (1 children)

Is that factoring in the always on cooling of the magnets?

[โ€“] [email protected] 0 points 1 year ago (1 children)

Here's an article about the subject, paper linked at the bottom of the article: https://phys.org/news/2010-12-high-speed-pollute-percent-traditional.html

[โ€“] [email protected] 2 points 1 year ago* (last edited 1 year ago)

Thx, as I understand it, this is calculated for traditional railway technology and does not have anything to do with to maglev.