The last line of the article I can personally attest to. I am trying to install solar panels on my house and the interconnection approval has taken over 8 months and I expect the overall project will be well over a year. It was originally planned to be up and running in 6 months.
this post was submitted on 23 Jun 2023
13 points (100.0% liked)
Technology
58303 readers
10 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
I haven't bothered with approval and installed an illegal 1.6 kWp system, and illegally (but safely) have the meter running backwards some of the time. Averaging 6 kWh/day so far. So make about half of the electricity I consume in a year.
I will probably add some storage next year, or so.
In Iowa we have so many wind turbines, it's really cool to see some of the fruits of their labor.