News
Welcome to the News community!
Rules:
1. Be civil
Attack the argument, not the person. No racism/sexism/bigotry. Good faith argumentation only. This includes accusing another user of being a bot or paid actor. Trolling is uncivil and is grounds for removal and/or a community ban.
2. All posts should contain a source (url) that is as reliable and unbiased as possible and must only contain one link.
Obvious right or left wing sources will be removed at the mods discretion. We have an actively updated blocklist, which you can see here: https://lemmy.world/post/2246130 if you feel like any website is missing, contact the mods. Supporting links can be added in comments or posted seperately but not to the post body.
3. No bots, spam or self-promotion.
Only approved bots, which follow the guidelines for bots set by the instance, are allowed.
4. Post titles should be the same as the article used as source.
Posts which titles don’t match the source won’t be removed, but the autoMod will notify you, and if your title misrepresents the original article, the post will be deleted. If the site changed their headline, the bot might still contact you, just ignore it, we won’t delete your post.
5. Only recent news is allowed.
Posts must be news from the most recent 30 days.
6. All posts must be news articles.
No opinion pieces, Listicles, editorials or celebrity gossip is allowed. All posts will be judged on a case-by-case basis.
7. No duplicate posts.
If a source you used was already posted by someone else, the autoMod will leave a message. Please remove your post if the autoMod is correct. If the post that matches your post is very old, we refer you to rule 5.
8. Misinformation is prohibited.
Misinformation / propaganda is strictly prohibited. Any comment or post containing or linking to misinformation will be removed. If you feel that your post has been removed in error, credible sources must be provided.
9. No link shorteners.
The auto mod will contact you if a link shortener is detected, please delete your post if they are right.
10. Don't copy entire article in your post body
For copyright reasons, you are not allowed to copy an entire article into your post body. This is an instance wide rule, that is strictly enforced in this community.
view the rest of the comments
I doubt it. Unless they have power storage of some kind, like SSR designs where they use a thermal battery of some kind.
The fundamental issue with nuclear power is that it produces a fixed output (which falls over time) which cannot be managed. Aside from just deleting what would otherwise be power (which is where the power storage comes into play)
It's not impossible though, but then again it's not impossible for any nuclear plant to store energy.
The small reactors on submarines can maneuver very quickly without causing fuel damage. Less power per core = less heat generation. Large reactors are limited by flux rate because they can have such high localized heating during maneuvering which has the potential to damage fuel. In that sense, SMRs could raise and lower power to meet demand or even operate on full power/standby basis like what gas plants offer during peak load.
I can’t speak to the strategy of an electric utility using SMRs, but to your point, I would think the idea would still be base load. Build a site with the potential for more SMRs to be built to meet demand in the future.
ok so i get what you're saying here.
But there is a fundamental thing with nuclear power, where the "burn up" of nuclear fuel doesnt change. In a submarine it doesn't matter because you're backed by a military force and you use 70-80% or 90+% enrichment, where as on land we have 3-5% upwards of 20% for the higher enrichment stuff these days i believe.
In the water its about safety and ensuring power production, on land it's about ensuring reliable and efficient power production. The only beneficial way of doing this is electricity storage. If you're nuclear reactor isn't producing power and has fuel, you are quite literally burning money. Think about it like diverting gas/coal input into a gas/coal fired power plant when power demands lower, as opposed to just lessening the consumption.
But yes it would be about 100% baseload first and foremost, everything else is a future concern, eliminate as much static load as you can and then deal with the rest in other manners.
Yeah I'm with you. I have a senior license at a US nuclear plant just for some background as I don't know yours. What I'm saying is that I can see value of multiple, say 300MW SMRs at a single site, that can go from 0-100% very quickly compared to current 900-1100MW reactors. So the idea would be you could have a plant in Mode 3 Hot Standby ready to raise power for peak loading. Ideally you'd have at least one reactor online at all times that provides its own in house loads and the standby in house loads that would be quite low. That is the value I see.
The issue at that point would be refueling and maintenance outages. It seems ideal that the design would need to support online refueling and enough loops/system availability to do the majority of plant maintenance online. In addition, the regulatory landscape has a lot of momentum to allowing plants to move to risk informed tech specs which allow for major equipment outages in modes of applicability. If the industry as a whole can agree on a handful of SMR designs with multiple capacity options, it really could be a stop gap to hopefully fingers crossed fusion power in, I don't know, 50-100 years from now? My two cents.
That is a particular type of reactor that is in testing.
https://www.forbes.com/sites/scottcarpenter/2020/08/31/bill-gates-nuclear-firm-says-new-reactor-can-backstop-grid-with-molten-salt-storage/?sh=d81c7c55e65c
Renewables being unable to do base load is just a myth that has been debunked countless times.
renewables can theoretically do baseload. The problem with renewables is that they don't really have a good pairing with something that would make it SIGNIFICANTLY easier to do.
Nuclear and solar power would make a great pairing for summer time midday peak draws for example. Wind is a good supplementary source. Hydro is a good stored energy source.
You can definitely do full renewable but it will still inevitably be better complimented by some form of baseload plant (i.e. nuclear)
I've love for just one of the people anonymously downvoting to chime in. What you wrote is completely accurate but every nuclear-themed post here and on Reddit is downvoted without anyone putting forward a counter-argument.
here https://www.pnas.org/doi/full/10.1073/pnas.1610381114 we can talk about this, feel free to put forward counter arguments, the gist of the cited paper is that previous studies claiming 100% renewable baseload is possible requires sketchy manipulation of the expected demand as well as currently unavailable storage technology on an almost impossible scale. We're working on all kinds of storage solutions but the reality is we're not there yet. I'm rooting for molten salt storage or compressed gas storage rather than ramping up more lithium battery storage. Flow batteries are promising as well, but in any case we won't have enough storage or transmission capability to have a 100% renewable baseload in the next couple of decades.
Looks like someone beat me to it :)
"In sum, Clack et al.’s analysis is riddled with errors and has no impact on Jacobson et al.’s conclusions."
https://www.pnas.org/doi/10.1073/pnas.1708069114
Surely there wouldn't any astroturfing be going on here, would there?
I don't think it's astroturfing, it's just cognitive dissonance. Lots of people were raised thinking that nuclear power was the future and they can't let go of that. That's why they downvote without commenting - there's no factual case for new nuclear and that goes double for SMRs.
there absolutely is. It's a good transitional source of power that we currently understand very well, and know how to manage, but simply cannot build. It would be a very prudent way of ensuring some "insurance" time before fusion starts being even remotely viable.
Although i don't think SMRs are the correct answer here.
Not with the design and build times new nuclear has. It can take 10-15 years to build a plant, and during that time costs will usually spiral and schedules will slip. At the same time, renewables and storage will have gotten even more competitive.
this is true, but nuclear plants are slated to run for 30-50 years. France has been running their existing fleet to 50 years with maintenance extensions.
There was a recent plant vogtle, i believe, that was finished. Although if im not mistaken i think they just stopped midway through that one, it is up and running right now though last i checked, maybe not generating power yet but definitely running.
I'm guessing you're referring to the flammanvile reactor project in france? If so thats an EPR design, which are horrendously complicated, and the vast majority of the issues present in the construction are the inability to pour concrete correctly, and the inability to weld correctly. Which is something that happens after 30 years of not building any nuclear plants. We quite literally just have to build more if we want to be able to use it.
It's true that renewables are more competitive, but solar requires significant power storage figures, which can be problematic at best. Or require other production methods to take up the slack. Wind is quite good, but has the significant problem of waste. Turbine blades are a huge mess. That's mostly due to industry pressure to make it profitable, and the push for it to succeed, which nuclear hasn't seen. Nuclear just needs the same thing.
No matter which angle I approach the topic from, it always comes back to this:
"findings suggest that the cost per kilowatt (KW) for utility-scale solar is less than $1,000, while the comparable cost per KW for nuclear power is between $6,500 and $12,250. At present estimates, the Vogtle nuclear plant will cost about $10,300 per KW, near the top of Lazard’s range. This means nuclear power is nearly 10 times more expensive to build than utility-scale solar on a cost per KW basis."
https://www.energysage.com/about-clean-energy/nuclear-energy/solar-vs-nuclear/
I just don't see how this makes any economic sense. Sure, we could go all in on new nuclear and it would work fine but I don't want to pay for that, I want cheap renewable power.
Then there's this:
https://www.reuters.com/business/energy/high-river-temperatures-limit-french-nuclear-power-production-2023-07-12/
Building a plant with a lifecycle of 30-50 years seems like a bad idea when our world is getting more and more unpredictable. We've got climate change, we've got Putin fucking around with 6 reactors in Ukraine, earthquakes, tsunamis, human error, etc.
If a wind turbine catches fire, it's not that big of a deal.
shits expensive because those plants are older, more complicated, and riddled with constructions issues. Literally all we have to do is just build more of them, and it will go away.
Or if that doesnt satisfy you, a one time government subsidy for the building costs will drastically improve it. (most of the cost is upfront after all.)
I’ve shown the data, there’s no economic case. Not to be an ass but your post reads like nuclear fanfic rather than a persuasive argument for new nuclear.
yes, i know, but it's more complicated than "just data" modern reactor designs are orders of magnitude simpler than previous designs, modern reactor issues are primarily construction related (a solvable issue) Nuclear is a particularly apt solution to the problem if done correctly.
Solar/wind IS cheaper, but solar and wind also have problems. Solar is more complicated at scale. You need to start balancing production/consumption on either side, neither of which are consistent. recycling and waste disposal is another big concern. Solar panels for instance consume tons of different rare earth metals, and materials that are hard to manufacture, dangerous for humans to work with, and complicated to get rid of. And add on top of that energy storage.
There isn't a "good" solution, merely a lot of different solutions, some more apt than others, sometimes it depends on the situation.
maybe i'm a little autistic about nuclear power, but you cannot deny it's potential application in the power production infrastructure. There is absolutely a case to be made there.
Vogtle 3 & 4 are AP1000s. Construction started in 2013 (preliminary work had started before this, but a design change halted it). Unit 3 was originally supposed to complete commissioning in 2017, but only happened last year. Unit 4 should be online this year. The initial $12B budget went to $14B at the start of construction, but will end up somewhere over $30B.
V.C . Summer in South Carolina has a similar project with two AP1000s. The initial budget was $9B, but the project was cancelled while under construction when projections put the total cost over $23B.
There have been 6 EPRs built, Flamanville-3, Olkiluoto-3, Taishan-1 & 2, and Hinkley Point C (2 units).
All of them are/were massively over budget and behind schedule.
Olkiluoto started construction in 2005, was supposed to complete commissioning in 2010, but only came online last year. Costs went from €3B to somewhere over €11B, the contract 'not-to-exceed' amount.
Flamanville started construction in 2007, was supposed to complete commissioning in 2012, but is projected to complete commissioning late this year. Costs went from €3.3B to somewhere over €20B.
Hinkley Point C is still under construction. It's difficult to put an actual start date because a pile of preliminary site prep work happened prior to real construction starting. Concrete was poured in 2016 though and it was supposed to be operational in 2023. They're now estimating 2028 at the earliest. Costs have gone from £16B to and estimated £35B.
Taishan 1 & 2 started construction in 2009/10 and went online in 2018/19, roughly 5 years late. Unit 1 had to be taken offline for a year due to faulty fuel bundles. Both units have had reliability issues. Costs ended up at the equivalent of $7.5B, almost double the original estimate.
TBF the EPR is just a horrifically complex design. It's no wonder they all sucked.
No, it's because it's an off topic tangent. We're talking about SMRs doing not-baseline. Not renewables doing baseline. The very fact they brought it up is indication of binary thought patterns like team sports thinking. "They are for this one thing I don't like, therefore they must be against the thing I do like!" kind of thing. False dichotomy.
Apparently it's also false on top of that. Go figure.