this post was submitted on 21 Jun 2023
6 points (100.0% liked)

Brisbane

956 readers
10 users here now

Home of the bin chicken. Visit our friends:

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 1 points 1 year ago (9 children)

Cr Murphy says the budget will include funding for the North Brisbane Bikeway stage 5. The stage that was basically ready to go until they cut it last year so they could keep funding road widening projects.

[–] [email protected] 1 points 1 year ago* (last edited 1 year ago) (1 children)

Cr Massey points out that Green Bridges was originally a Greens policy from the 2016 election. She points out the failure to deliver the 5 Green Bridges that the LNP promised at the last election. None have actually been delivered so far. One has been cancelled entirely. Two have been indefinitely postponed. 2 are, at least, still being built.

She points out important missing links like Dornoch Terrace, Vulture Street, and Ipswich Road. Many links that are completely unaddressed by this budget. And that's just in her ward.

[–] [email protected] 1 points 1 year ago

Collier's the Morningside ward councillor, did you mean Massey?

load more comments (7 replies)