World News
A community for discussing events around the World
Rules:
-
Rule 1: posts have the following requirements:
- Post news articles only
- Video links are NOT articles and will be removed.
- Title must match the article headline
- Not United States Internal News
- Recent (Past 30 Days)
- Screenshots/links to other social media sites (Twitter/X/Facebook/Youtube/reddit, etc.) are explicitly forbidden, as are link shorteners.
-
Rule 2: Do not copy the entire article into your post. The key points in 1-2 paragraphs is allowed (even encouraged!), but large segments of articles posted in the body will result in the post being removed. If you have to stop and think "Is this fair use?", it probably isn't. Archive links, especially the ones created on link submission, are absolutely allowed but those that avoid paywalls are not.
-
Rule 3: Opinions articles, or Articles based on misinformation/propaganda may be removed. Sources that have a Low or Very Low factual reporting rating or MBFC Credibility Rating may be removed.
-
Rule 4: Posts or comments that are homophobic, transphobic, racist, sexist, anti-religious, or ableist will be removed. “Ironic” prejudice is just prejudiced.
-
Posts and comments must abide by the lemmy.world terms of service UPDATED AS OF 10/19
-
Rule 5: Keep it civil. It's OK to say the subject of an article is behaving like a (pejorative, pejorative). It's NOT OK to say another USER is (pejorative). Strong language is fine, just not directed at other members. Engage in good-faith and with respect! This includes accusing another user of being a bot or paid actor. Trolling is uncivil and is grounds for removal and/or a community ban.
-
Rule 6: Memes, spam, other low effort posting, reposts, misinformation, advocating violence, off-topic, trolling, offensive, regarding the moderators or meta in content may be removed at any time.
-
Rule 7: We didn't USED to need a rule about how many posts one could make in a day, then someone posted NINETEEN articles in a single day. Not comments, FULL ARTICLES. If you're posting more than say, 10 or so, consider going outside and touching grass. We reserve the right to limit over-posting so a single user does not dominate the front page.
We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.
All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.
Lemmy World Partners
News [email protected]
Politics [email protected]
World Politics [email protected]
Recommendations
For Firefox users, there is media bias / propaganda / fact check plugin.
https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/
- Consider including the article’s mediabiasfactcheck.com/ link
view the rest of the comments
Long lead times against nuclear have bee raised for the last 25 years, if we had just got on with it we would have the capacity by now. Just cause the lead time is in years doesn't mean it isn't worth doing.
when is the best time to plant a tree? 30 years ago. When is the second best time? now.
Surely the second best time would have been 29 years ago
Don't fuck this up for me bro
As others pointed out, to build that many nuclear power plants that quickly would require 10x-ing the world's construction capacity.
My counterpoint is that if we had "just got on with it" for solar, wind, and battery, we would have the capacity by now and the cost per kwh of that capacity would be approximately half as much as the same in nuclear. And we would have amortized the costs.
No it wouldn't. China laid more concrete in 5 years than the entire world did in 100 years. I highly doubt that converting the entire world to nuclear is going to use that much more concrete. I mean hell, they laid like 15 or 20,000 miles of high speed rail in just a few years. They built like 300 million apartment units.
Just did a bunch of my own math before realizing those numbers were already out there. We would need to add 3960 nuclear plants to match current energy demand for the world (440 power 10% of the world).
That would require at least 5 years of construction per plant. It takes about 7000 workers to produce a nuclear plant. To produce them concurrently would require about 27.7 million construction workers dedicated to this project for at least 5 years. So on one hand, perhaps you're right, since there are 100M construction workers in the world. I can't, however, find numbers about how much heavy equipment exists to facilitate a product requiring 1/4 the world's construction workers concurrently. You might be right that if all other construction were ground to a halt, we might be able to manage a 5-year plan of nuclear at the cost of about $20T (I had done the math before realizing this reply were about workers, not cost stupidity). I concede it seems "10x increase world construction capacity" was wrong, and the real number is somewhere around 1.5-2x, so long as we stay conservative with nuclear figures and ignore extra costs of building or transporting nuclear energy to countries incapable of building their own plants.
Interestingly, at those construction numbers, you could provide small-project rooftop solar to the world. I can't find construction numbers for power farm solar, except that it's dramatically more efficient than rooftop solar. Unlike nuclear, it appears we could easily squeeze full-world solar with our current world construction capacity.
I won't bore you with the cost math, but since I calculated them I'm still going to summarize them. Going full nuclear would cost us about a $20T down payment. Going full solar (with storage) down payment is about $4T (only about $1T without storage costs factored). And while nuclear would be cheaper than solar per year after that $20T down, solar power and storage would STILL be cheaper in a 100 year outlook, but would also benefit from rolling efficiency increases as we add new solar plants/capacitors and tear down older ones..
Not all 7,000 construction workers would be working on the site concurrently. Different trades come and go depending on the phase of the project. So at first you'll have the civil engineering earth movers come in, who clears the site and excavates the foundations. Then you'll have the concrete crews come in who pour the foundations and do all of the concrete work. Obviously on a nuclear power plant there is a lot of foundation work, as well as a lot of above ground concrete so probably a good chunk of the construction workers will fall into this category.
Power plants also have a lot of structural steel work, electrical and special equipment that would likey fall under the piping category but each of these uses a separate set of skilled labor that does not overlap.
If you were going to actually try to build 3,300 nuclear power plants, you would rotate crews from project to project which would increase efficiency rather than hiring 27 million separate workers.
In any case, I don't think converting the world's total electrical power generation to 100% nuclear is by any stretch of the imagination a good idea. Personally I think maybe 15 to 25% nuclear power generation would be a more realistic mix, similar to the US electrical power generation. The rest of the power should be solar, wind, hydro, wave and geothermal as they are absolutely cheaper to build.
I'm not sure I agree with how you'd be able to execute on that level or organized construction safely, but I think we're also reaching the "impossible-to-be-sure hypothetical" territory, so I'll concede the point for now.
I think my problems of cost and time still stand. It looks like adding rooftop solar with batteries to every building is still cheaper (on startup, and likely per MW) than nuclear plants. Regions that cannot support solar, onland wind, geo, or hydro can justify nuclear (at least unless shipping batteries or hydrogen conversion becomes cheap enough to compete), but I don't think they amount to nearly 15% of the power needs in the world since they represent fairly distinctive regions with low energy demand.
We do it all the time in the construction industry.
For instance, Bechtel has 55,000 people in the US.
So just hire them. Too bad they lost almost all of their institutional knowledge about nuclear construction compared to what they used to have.
Long lead times, cost overruns, producing power at a higher price point than renewables, long run time needed to break even, even longer dismantling times and a still unsolved waste problem. Compared to renewables that we can build right now.
Nice, we can defer the problem to the next generation.
And unlike nuclear reactors, solar panels can be recycled completely
The plan is the same as for all other parts, recycling. The US gas no provisions about recycling currently, which is the reason people choose the cheapest disposal method currently, just dumping it.
Did you read the quote? 15-20 years, as in decades before 1 nuke plant is built. I agree in that politicians of the past should have led us to a more sustainable and resilient energy future, but we're here now.
Advanced nuclear should still be 100% pursued to try to get those lead times down and to incorporate things like waste recycling, modularity, etc., but the lead time in decades absolutely means nuclear power might not be something worth doing.
The IPCC puts the next 10-20 years as the most important and perilous for getting a hold on climate change. If we wait for that long by not rolling out emission-free power sources, transit modes, or even carbon-free concrete, etc., then we might cross planetary boundaries that we can't come back from.
Nuclear is a safe bet and bet worth pursuing. I would argue that, along with that source from the IAEA, old nuclear is note worth it.
How much concrete does it take to build a nuclear plant? Concrete production is currently 8% of global emissions, so if you have to scale up construction capacity 10x for the next decade, don't you end up destroying the environment with concrete before they are even operational?
Great point. You need concrete for wind, solar, and li-ion battery storage too (including pumped hydro), but out of those I'd say pumped hydro is the only one that remotely compares in the amount of concrete needed for construction.
So purely looking at the emissions from materials needed to build these power sources, renewables have the edge due to less concrete. These emissions might show up elsewhere in raw material extraction like with silicon for solar, and then the rare earth metals needed for generators in wind, all the lithium/nickel/cobalt needed for batteries, etc., but I want to say that the Life Cycle Assessments (LCAs) from places like the National Renewable Energy Laboratory (NREL) in the US or the International Energy Agency (IEA) worldwide have taken that into account and still show that renewables + storage are cheaper on a carbon basis compared to fossil fuels and nuclear.
The cool thing about concrete for renewables (excluding hydro dam) is only the very base pad needs to be virgin. You can make a lot of the rest of the base and fill material with down cycled concrete. So tearing down part of an old factory on land near the solar panels are? Crush it up and only move it a few miles over to where you need it. Rather than hauling that to a landfill where it sits forever, costing energy use to haul, and more energy use to bring the fill and other bade materials from a further destination.