this post was submitted on 30 Aug 2023
2168 points (94.1% liked)

World News

38705 readers
4 users here now

A community for discussing events around the World

Rules:

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News [email protected]

Politics [email protected]

World Politics [email protected]


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 9 points 1 year ago (3 children)

Gee, I wonder if the cost might go down if we built more of them, as is the case with, y'know, basically every other complicated thing that humans build.

[–] [email protected] 7 points 1 year ago (1 children)

So even if I follow your logic, that nuclear plants will get cheaper and faster to build, wich I'm not, you still have to build the first generation of plants slow and expensive. So we either wait 15 years to get better at building those plants, or we just build renewables right now.

[–] [email protected] 7 points 1 year ago (2 children)

So we either wait 15 years to get better at building those plants, or we just build renewables right now.

We do both. This isn't a binary choice.

[–] [email protected] 1 points 1 year ago (2 children)

So what happens when you finish pouring the concrete in 15 years and the demand has already been satisfied by renewables? Concrete production alone accounts for ~8% of global emissions.

I am not anti-nucleur, I wish we invested more decades ago.

[–] [email protected] 1 points 1 year ago

We could build them in a lot less time than 15 years, we'd just need to summon up the political will for it. I'm not saying we should stop building Wind or Solar either.

[–] [email protected] 1 points 1 year ago* (last edited 1 year ago)

Well demand isn't going to go down, and we're going to have to replace all of the old power plants anyways, even if they are solar or wind. Everything that we build has a lifespan, and the United States has a heck of a lot of legacy power plants that are going to be decommissioned over the next 100 years regardless of what type of plants these are. Solar, wind, hydro, coal, gas, nuclear... Nothing lasts forever.

[–] [email protected] 0 points 1 year ago (1 children)

Money and manpower are not infinite. Any money spent on one is a choice not to spend it on the other.

[–] [email protected] 2 points 1 year ago* (last edited 1 year ago)

Money and manpower are not infinite.

Functionally they are because different Capital Groups will chase different projects. For instance Bill Gates / TerraPower is heavily backing both Fusion and SMR Fission technology.

Meanwhile other Capital Groups like Anschutz are piling money into Wind Farms then there's yet other groups like Silicon Ranch pouring money into Solar Farms.

It seems to have escaped the notice of most Netizens but the big money Capitalists have finally come out to play in the Green / Renewable Energy space. Sure there's an absolute limit on the money and manpower that even they can afford but practically speaking those limits are so high that we're unlikely to reach them.

[–] [email protected] 3 points 1 year ago (1 children)

Except throughout the history of nuclear power it has always gotten more expensive, regardless of time period, learning curve, adoption curve, or any other variable you care to consider. Solar, wind, and batteries have always gotten cheaper and continue to do so.

[–] [email protected] 1 points 1 year ago

Is there some reason for that? What makes nuclear power fundamentally different from all other human undertakings?

[–] [email protected] 1 points 1 year ago

Yes that is exactly what would happen. To do that though, you really need state funding, state approval, and a secure supply chain as well as experienced engineers, management and construction and supply chains.