this post was submitted on 07 Aug 2023
89 points (97.8% liked)
Europe
8324 readers
1 users here now
News/Interesting Stories/Beautiful Pictures from Europe ๐ช๐บ
(Current banner: Thunder mountain, Germany, ๐ฉ๐ช ) Feel free to post submissions for banner pictures
Rules
(This list is obviously incomplete, but it will get expanded when necessary)
- Be nice to each other (e.g. No direct insults against each other);
- No racism, antisemitism, dehumanisation of minorities or glorification of National Socialism allowed;
- No posts linking to mis-information funded by foreign states or billionaires.
Also check out [email protected]
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis
Ah, but historically, France is not an outlier. Here are the largest 10-year deployments of clean energy sources. The green ones are nuclear.
Nuclear doesn't take long.
Here is an overview of historic build times.
The task is not fearing we might get a bad case, but creating an environment in which we get a good one.
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis That graph includes some huge deployments of wind, and today, it's a mature, cheap technology (though still improving). Same with solar.
On the timescale on which the historic installs occurred, that was not the case: nuclear and hydro were the only mature options.
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis Can you name *one* nuclear project in the last 20 years in Europe that wasn't severely over-budget and severely delayed?
It's not just the UK. Every third gen PWR has taken way longer than expected.
The public rightly insist on the safest designs possible. And those at least have been tried once (generally only once!). However, they take a long time.