this post was submitted on 22 Aug 2024
305 points (100.0% liked)

unions

1385 readers
68 users here now

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 3 points 3 months ago (1 children)

Presumably a lot of the actual labor costs are hidden in outsourced parts of the build process.

[–] [email protected] 4 points 3 months ago (1 children)

I'd have to figure on airplane parts, 25% of the cost could be on QC alone.

[–] [email protected] 1 points 3 months ago (1 children)

What is the expensive part you imagine about QC that isn't labor? I mean sure, you need the occasional destructive test and some fuel and hangar rent but mainly it is people doing the quality control checks.

[–] [email protected] 2 points 3 months ago

I wasn't. That's why I figured 3% is ridiculously low.