this post was submitted on 02 Jun 2024
68 points (100.0% liked)

Electric Vehicles

3151 readers
1 users here now

A community for the sharing of links, news, and discussion related to Electric Vehicles.

Rules

  1. No bigotry - including racism, sexism, ableism, homophobia, transphobia, or xenophobia.
  2. Be respectful, especially when disagreeing. Everyone should feel welcome here.
  3. No self-promotion
  4. No irrelevant content. All posts must be relevant and related to plug-in electric vehicles — BEVs or PHEVs.
  5. No trolling
  6. Policy, not politics. Submissions and comments about effective policymaking are allowed and encouraged in the community, however conversations and submissions about parties, politicians, and those devolving into general tribalism will be removed.

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] h54 5 points 5 months ago (2 children)

Municipal waste collection seems like the perfect usecase for electrification. Low speed and frequent stops.

[–] [email protected] 5 points 5 months ago (2 children)

Low speed and frequent stops.

Also periodic forced "return to base" (truck is full), which presents an obvious opportunity to recharge.

[–] [email protected] 5 points 5 months ago

Typically these trucks are only at a facility for 10-15 minutes, with only a few of those minutes being stationary. Unless they were fitted with a roof mounted charging set up with overhead wires, charging at the waste drop off wouldn't be worthwhile.

Another option would be doubling the fleet so the operators could switch trucks after tipping to allow the first vehicle charge time - however that's not economical. I found on their website these trucks have 376 kWh capacity. Not listed on their site is the expected range, but that's understandable given the varying needs of this type of vehicle.

Mack's MD Electric has a range of 225-370 kilometres. Some data I found online showed average route distances being around 100 kilometres, with the trucks being able to make two trips to the landfill per 8 hour workday.

If we assume the Mack LR will get half the range of the MD, a bit of route management makes two loads a day perfectly feasible without middle of shift charging.

[–] h54 4 points 5 months ago

Perhaps battery swapping tech for larger vehicles makes sense, depending on the usecase.

example

[–] [email protected] 4 points 5 months ago

And lower maintenance which means long term savings!